Clear and grade the house site
The CAT 316F cleared timber and root balls from the building area. As we graded the pad, we checked elevations with a laser transit to keep a consistent reference across the slope.

We cleared and graded a new driveway and prepared the homesite for construction. We used a laser transit to check the house pad elevations, then hauled and spread crushed stone along the driveway.

“Kyle and the gang were excellent to work with. They were able to get us exactly what we wanted. I recommend them highly”
The owner needed a graded building site and driveway access for construction. The ground fell away from the house site, so we had to account for that elevation change as we graded the driveway into the slope.
Where the driveway crossed the slope, runoff from the uphill bank also needed a route beneath the stone surface.
During clearing
Finished drivewayThe CAT 316F cleared timber and root balls from the building area. As we graded the pad, we checked elevations with a laser transit to keep a consistent reference across the slope.
We cleared and graded the driveway through the wooded slope. Our trucks delivered crushed stone, and the crew spread and graded it along the new approach.
The culvert carries hillside runoff beneath the gravel. Erosion-control cover protects the exposed banks as grass takes root.
Follow the crew from timber clearing and gravel hauling to the finished driveway and culvert outlet.





Text the property address and a few photos to 336-739-0364. We’ll walk the site with you to look at access, grading and drainage.
Boone excavation and grading · Homesite preparation · Driveway construction